Jump to content

LED fog/turn signal lights


Recommended Posts

Any idea on shipping cost to postcode 1026 in New Zealand?

 

would be shipped using US postal priority international for $47.95. This is the cheapest method. delivery within 6-10 days

Edited by 87quest_stv
Link to comment
Share on other sites

Love the idea and they look great but i would love the possibility of using Burtons lens's to go with it or Moto's. I already have Burtons so I love the murdered look but I would love the LED's to go behind em. love the projector lights to by the way. Once I am done with engine rebuild I will be interested in seeing where you are at with production sir.
Link to comment
Share on other sites

Ok guys I got some of Burton's fog covers and will be able to include mounts for the fog covers. The one's I got were the light tinted. So you can get an idea of the look.

The only thing you'll need to do is modify the black finishing cap base to accept the new bolt.

 

http://www.getyasumminimotos.com/Conquest/Ffog.JPG

http://www.getyasumminimotos.com/Conquest/Ffog2.JPG

Edited by 87quest_stv
Link to comment
Share on other sites

Ok guys I got some of Burton's fog covers and will be able to include mounts for the fog covers. The one's I got were the light tinted. So you can get an idea of the look.

The only thing you'll need to do is modify the black finishing cap base to accept the new bolt.

 

http://www.getyasumminimotos.com/Conquest/Ffog.JPG

http://www.getyasumminimotos.com/Conquest/Ffog2.JPG

now that looks awesome! i'm glad i'm on the list!

Link to comment
Share on other sites

re u going to make another run of these , i def be in for a set ^_^

 

Still in the process of making the first run. I have 10 people on the list, only 5 have given deposits so far. With 1 more deposit in the mail, that I haven't received. So I guess I have 4 slots open until I get deposits on them.

Link to comment
Share on other sites

I just got back from my buddy's. We spent the whole afternoon on the cad program drawing out my templates and putting them to the flow jet. We Made parts for 2 pairs so I can finish the fabrication and make sure there aren't any issues with the CAD design. So once I finalize these flow jetted parts I'll finish the run of what I need on this Weds.
Link to comment
Share on other sites

Ok guys, CAD design was successful, everything fit very nicely. I'll be going to my buddy's on Weds (tentatively) to finish the run of parts. Still waiting on my lights to get here. Should be here this week sometime. I'm leaving Thurs for Ohio and will be back Early Tues Of next week. Will be able to have the products ready to ship by that Friday June 1st. I'll be notifying everyone on the list that hasn't left a deposit by PM. I have others that Want to get in on this and wanting to secure their spot with a deposit right away. So those on the list that haven't sent the deposit please do so if you still want the lights.
Link to comment
Share on other sites

Join the conversation

You can post now and register later. If you have an account, sign in now to post with your account.

Guest
Reply to this topic...

×   Pasted as rich text.   Paste as plain text instead

  Only 75 emoji are allowed.

×   Your link has been automatically embedded.   Display as a link instead

×   Your previous content has been restored.   Clear editor

×   You cannot paste images directly. Upload or insert images from URL.

Loading...
 Share

×
×
  • Create New...